If you're planning to build in Cooma, the work you do before you apply matters more than the rate you chase. Lenders want to see a clear plan, a solid contract and a borrower who can handle repayments once the build starts.
This guide covers what to sort out first so your construction loan application doesn't stall halfway through.
How Does a Construction Loan Work?
A construction loan pays your builder in stages as the work is completed, rather than giving you the full amount on day one. Interest is normally charged only on the amount drawn so far, though each lender sets its own terms.
That means your repayments start small and grow as the build moves along. Each stage is usually paid after the builder claims it and the lender is satisfied the work is done. Some lenders ask for an inspection first. In NSW, Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection by an outside inspector, so it pays to ask what your lender requires.
The number of drawdowns, the repayment type during the build, fees and time limits all differ between lenders. A broker can compare construction loan options from banks and lenders across Australia, so you're not stuck with one bank's rules.
What Should You Have Ready Before Applying for Construction Finance?
Before you apply, have your building contract, council plans and approvals, and a clear picture of your income and savings ready. Lenders can't assess a build they can't see on paper.
Start with the contract. A fixed price building contract gives the lender a firm number to work with. A cost plus contract can shift as the job goes on, which makes it harder to plan around. Whichever you choose, check the builder is a registered builder and that the contract includes a progress payment schedule.
Next, think about approvals. Your build will need a development application or a complying development certificate, plus council approval, before work starts. If you're unsure which applies to your block, Snowy Monaro Regional Council is the place to ask.
Finally, get a read on your numbers. Our borrowing capacity page is a good starting point, and you can talk it through with the team at Range Finance in Cooma.
Why Lenders Check Your Repayments at a Higher Rate
Banks must test whether you can afford your loan at a rate well above the one you'll actually pay. For banks regulated by APRA, that buffer is 3 percentage points above the loan's rate, and APRA confirmed in May 2026 that it was staying put.
So a borrower looking at a loan at the 6.75% p.a. illustrative rate would be assessed as if the rate were 9.75% p.a. This is a test only, not what you'll pay. The trade-off is that your borrowing power may be lower than you hoped, so it's worth knowing your number before you sign a contract.
Less stable income, like overtime or bonuses, is often discounted. A prudent bank will apply a discount of at least 20 per cent to it. If your pay varies, bring a longer history of payslips or tax returns.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at Range Finance today.
How Do Progress Payments Work Under a NSW Building Contract?
In NSW, a building contract over $20,000 must include a progress payment schedule, and payments must match the work actually done. The deposit can't be more than 10 per cent of the contract price.
Payments can be fixed amounts or percentages tied to stages, or they can be claimed as work is carried out, backed by documents. Where Home Building Compensation Scheme cover is needed, which applies to contracts over $20,000, the builder can't ask for a deposit or other payment until the cover is in place and a certificate is given. You also get a cooling-off period of five clear business days.
This matters for your loan because your lender will line up its drawdowns with your contract. If the schedule asks for money earlier than the work justifies, you may be left covering the gap yourself. Read the schedule closely and ask your broker to check it against the lender's drawdown rules before you sign.
A Cooma Example: Matching the Loan to the Contract
Consider a Cooma couple who've bought a block and signed a fixed price contract with a registered builder. They've also saved for the build and kept their budget tight. Their plan is to start the work in spring.
Their broker reads the contract and notices the builder's schedule asks for a large payment at frame stage. The lender's drawdown rules pay out in smaller steps. The mismatch would have left the couple short of cash at a critical point.
The fix is straightforward to describe. Before signing, they ask the builder to adjust the schedule so the stages line up with the lender's, and the broker confirms the lender's inspection process. The builder agrees. The build goes ahead with each payment matched to completed work, and the couple's repayments grow gradually in line with the amount drawn. The trade-off is a little more time before signing, but they avoid a cash shortfall mid-build.
Do You Pay Interest During the Build?
Yes, in most cases you pay interest on the amount drawn so far, and NSW Government guidance says repayments begin once the first progress payment is made. Your lender will confirm the exact repayment type during the build.
Some lenders offer interest-only repayment options during construction. The trade-off is that you're not paying down the loan during that period, so the balance doesn't shrink. If interest-only applies, the later principal and interest repayments are assessed over the shorter remaining term. Our construction loans page explains the options. If you're renting or paying another mortgage while you build, add that cost to your budget, because you'll be covering both for a while.
Can First Home Buyers Get Help When Building?
Possibly. In NSW, the First Home Owner Grant is $10,000 for eligible new homes, and for vacant land with a building contract, the combined value of land, contract and variations must not exceed $750,000.
The home must also be lived in as your main residence for at least 12 continuous months within 12 months of construction or purchase, for contracts signed on or after 1 July 2023. Applications needed for settlement or a first drawdown are lodged through the approved agent providing your finance. Our first home buyers page covers more, and eligibility can change, so check with Revenue NSW before you rely on it.
If you're building an investment property, speak to your accountant about holding costs and deductions. Tax outcomes depend on your situation.
Frequently Asked Questions
How are construction loan payments made?
Your lender pays the builder in stages as work is completed, and interest is normally charged on the amount drawn so far. Each lender sets its own drawdown and inspection rules.
What is the maximum deposit on a NSW building contract?
Under the Home Building Act 1989 (NSW), the maximum deposit is 10 per cent. Contracts over $20,000 must include a progress payment schedule.
Do banks test construction loan repayments at a higher rate?
Yes. APRA-regulated banks must assess your ability to repay at a rate at least 3 percentage points above the loan rate. This is a test only and not the rate you pay.
Can I get the First Home Owner Grant if I build in Cooma?
In NSW, the grant is $10,000 for eligible new homes, with a combined value cap of $750,000 for land and a building contract. Check current eligibility with Revenue NSW.